BATAVIA, Ohio — Crews will perform edge repairs on Musgrove Road in Williamsburg Township on Monday and pave White Oak Road in Pierce Township on Tuesday, according to the Clermont County Engineer’s Office.
The tentative schedule, posted by the engineer’s office on Facebook, begins Monday, Oct. 26, with the Musgrove Road edge repairs. Paving on White Oak Road is scheduled for Tuesday, Oct. 27. Dates and locations are subject to change because of weather or other unforeseen conditions, the office said.

Both roads are part of the county’s 2026 Road Resurfacing Program, a collaborative initiative in which townships and the Village of Williamsburg combine projects with the county’s annual resurfacing effort to secure lower unit pricing, according to the engineer’s office. The program covers 58 roads spanning about 15.5 miles across eight townships and the village, with a combined budget of roughly $2.74 million.
Williamsburg Township’s share of the program covers two roads totaling 0.809 miles at a cost of $80,000. Pierce Township’s share covers seven roads totaling 1.489 miles at a cost of $361,000, according to the engineer’s office.
The Clermont County Board of Commissioners publicly bids and manages the resurfacing projects, with actual costs billed to each township after bids are opened, the engineer’s office said. The agreement runs for two years, with the work expected to be complete by fall 2026.
Jeremy Evans serves as Clermont County Engineer, an elected office responsible for the design, construction and maintenance of the county’s roads and bridges.
The engineer’s office asked drivers to use caution and watch for crews and equipment when traveling through work zones.
The information contained in this story was obtained from the Clermont County Engineer’s Office.
